General Plan:
Replace eight (8) sections of underground steam conduits serving various campus facilities, most of which were constructed within concrete box conduits. Then New concrete box conduits (where required) will be constructed to enclose the replacement steam and condensate piping sections, reusing the steam piping where possible.

