Environmental Survey: Mellencamp Hall
| Mellencamp Hall Building #1976 2442 E. Kenwood Blvd. Built: 1953 Renovated: 1969 Renovated: 1985 Space: 40,708 gsf Two stories plus basement and penthouse Original Cost: $780,000 |
![]() |
The building served as the College and University library from November, 1954 until February, 1967, and was unofficially called Kenwood Library. The Division of Student Affairs moved into the building in August, 1969 after remodeling at a cost of $293,879. Mellencamp is currently an administrative and student services building.
The heating/ventilation/air conditioning (HVAC) system was tested and rebalanced in January, 1997. The HVAC is a constant volume re-heat system, and the building has openable windows. The fresh-air intake is located on the roof, in the center of the building. The air is filtered, heated/chilled, and distributed to occupied areas through sheet metal and/or flexible ductwork. Air is returned to the HVAC for reconditioning through ceiling plenums and ductwork. Physical Plant Services (PPS) performs routine inspection and maintenance of the building's mechanical equipment. PPS monitors and controls the HVAC by use of the Metasys System. Other HVAC maintenance and upgrades included chilled water coil replacement and duct cleaning (August 2001). Also in 2001, the Mellencamp "tunnel" was abated and reinsulated.
Several other environmental surveys have been conducted, including a radon survey (1989), and several IAQ evaluations based on renovation/maintenance projects or occupant concerns. The evaluations have consisted of routine visual inspections of HVAC components, as well as air analysis (for carbon dioxide, carbon monoxide, general hydrocarbons, asbestos, temperature, humidity, etc.).
Fall 2002:
The most recent IAQ investigation included a room-by-room ventilation survey, completed December 2002 by PPS and EHSRM. Investigation is ongoing as of this printing:
- HVAC survey sorted by room (primary file)
- HVAC survey sorted by HVAC system
- HVAC survey sorted by cfm
- Lavatory Exhaust and Air Exchange Data (December 2002)

- HVAC (1968 renovation):
- Trouble Reports were issued to Physical Plant Services for the following items:
Occupant referral regarding "no heat in 101 lavatory".
- Occupant referral regarding malodors and poor exhaust ventilation in lavatories, particularly 150A and 250B.
- The occupant referral regarding frequent "Burger King" odors from the Student Union still requires investigation in regard to proper stack height of the grill's exhaust on the Union's roof. A higher stack was installed to improve dispersion, but was then removed for aesthetic reasons.
Winter 2003:
- January 2003: All B48 plenum booster coils cleaned.
- February 2003: New exhaust fan installed for west lavatories.
- March 2003: short-term and long-term HVAC maintenance schedule developed by PPS.
- Spring 2003: Room-by-room recheck of supply air (SA) to be scheduled after necessary maintenance work.
Spring 2004:
- April 2004: investigaton of boost fans #3, #4 and #5 service area.
Fall 2004/Winter 2005:
- continuation of HVAC maintenance and evaluation by Mared Mechanical
Chemicals Used In Mellencamp Hall (1999 report):
The chemicals primarily used in this building are the general custodial and cleaning products used by PPS Buildings and Grounds. Pesticides are only applied if warranted, but pest control is normally not required. PPS Preventative Maintenance may perform routine maintenance on mechanical equipment which requires the use of chemicals, but this work is infrequent and performed in isolated areas such as equipment rooms. Several departments have recently installed new carpet. Some departments have copying processes, but these operations are not believed to adversely affect the building's air quality.
| Please Note: This page is (1) under development, (2) is in rough-draft form, and (3) has not been peer-reviewed. |