| |
|
| |
| |
 |
|
|
|
Advanced Gear Design and Theory
|
|
|
Civil Engineering Refresher
11 Thu., Aug. 8-Oct. 17
11 Thu., Jan. 23-Apr. 3, 2014 |
|
|
Design and Maintenance of Stormwater Infiltration Practices
|
|
|
Designing Plastic Parts for the Injection Molding Process
Mon.-Tue., Nov. 4-5
Mon.-Tue., May 12-13, 2014 |
|
|
Discussion of Widespread Power System Blackouts 
Fri., Oct. 25
Fri., Apr. 11, 2014 |
|
|
Electrical Substation Design Fundamentals
Mon.-Wed., Oct. 14-16
Mon.-Wed., May 5-7, 2014 |
|
|
Electrical Substation Equipment Aging
Tue.-Thu., Nov. 5-7
Tue.-Thu., May 6-8, 2014 |
|
|
Engineering Ethics
June 3-30
July 1-31
Aug. 5-31 |
|
|
Fundamentals of Engineering Refresher
11 Thu., Aug. 8-Oct. 17
11 Thu., Jan. 23-Apr. 3, 2014 |
|
|
Geometric Dimensioning & Tolerancing
Wed.-Fri., Sep. 18-20
Wed.-Fri., Mar. 19-21, 2014 |
|
|
Introduction to Materials used in Electrical Equipment 
Mon., Nov. 4
Mon., May 5, 2014 |
|
|
Introduction to Power System Load Models 
Mon., Oct. 21
Mon., Apr. 7, 2014 |
|
|
Introduction to the Cost of Electrical Power at Generator Stations 
Mon., Sep. 30
Mon., Apr. 28, 2014 |
|
|
Introduction to the Cost of Power at Customer Meter Bases 
Fri., Oct. 4
Fri., May 2, 2014 |
|
|
Inventive Problem Solving with TRIZ 
|
|
|
Molding of Rubber and Design of Rubber Molds
Mon.-Wed., Oct. 21-23
Mon.-Wed., Apr. 21-23, 2014 |
|
|
Native Landscape Design for Stormwater
Thu., Oct. 17
Thu., Mar. 27, 2014 |
|
|
Office Lean Module I
Tue.-Thu., Sep. 24-26
Tue.-Thu., Feb. 4-6, 2014 |
|
|
Office Lean Module II
Tue.-Thu., Oct. 29-31
Tue.-Thu., Mar. 4-6, 2014 |
|
|
PC Applications in Parallel Axis Gear System Design and Analysis
|
|
|
Plastic Injection Mold Design Advanced
Thu.-Fri., Sep. 19-20
Thu.-Fri., Apr. 24-25, 2014 |
|
|
Plastic Injection Mold Design Basics
Mon.-Wed., Sep. 16-18
Mon.-Wed., Apr. 21-23, 2014 |
|
|
Practices in Leadership and Strategy 
|
|
|
Presentation of Forensic Investigation Case Studies 
Fri., Nov. 8
Fri., May 9, 2014 |
|
|
Protective Relaying Principles & Applications
Tue.-Thu., Oct. 22-24
Tue.-Thu., Apr. 8-10, 2014 |
|
|
Rubber Compounding and Mixing for Performance
|
|
|
Simply Snap-Fits: Developing World-Class Snap-Fit Attachments 
Mon.-Tue., Sep. 30-Oct. 1 |
|
|
Six Sigma Black Belt Module I - Define and Measure
Tue.-Thu., Sept. 17-19
Tue.-Thu., Mar. 18-20, 2014 |
|
|
Six Sigma Black Belt Module II - Measure and Analyze
Tue.-Wed., Oct. 1-2
Tue.-Wed., Apr. 8-9, 2014 |
|
|
Six Sigma Black Belt Module III - Analyze and Improve
Tue.-Wed., Oct. 22-23
Tue.-Wed., May 6-7, 2014 |
|
|
Six Sigma Black Belt Module IV - Improve and Control
Tue.-Thu., Nov. 12-14
Tue.-Thu., May 20-22, 2014 |
|
|
Sustainable Water Management - An Introduction
Wed.,Oct. 9
Thu., Feb. 20, 2014 |
|
|
The Essentials of Silicone Elastomers 
|
|
|
Tolerance Stack Up Analysis
Wed.-Fri., Oct. 30-Nov. 1
Wed.-Fri., Apr. 23-25, 2014 |
|
|
Transfer of Medical Elastomeric Part Production to a Contract Manufacturer with Full Validation 
|
|
|
Transmission Line Design
Wed.-Fri., Apr. 9-11, 2014 |
|
|
Understanding Power System Design & Operation
Tue.-Thu., Oct. 1-3
Tue.-Thu., Apr. 29-May 1, 2014 |
|
|
Water Harvesting Systems and Application
|
|
|
Water Law for Sustainable Management
|
|
|
WiSE Breakfast Series - Innovation - Because Growth Matters
|
|
|
Wisconsin Sedimentation & Erosion Control Inspector (WISECI)TM Best Management Practices
Thu.-Fri., Nov. 7-8
Thu.-Fri., Mar. 13-14, 2014 |
| |
|
|
|
Biomimicry for Sustainable Watersheds and Coasts |
|
|
Constructed Wetlands |
|
|
Fundamentals of Gear Design |
|
|
Generator Protection |
|
|
Innovative Solutions for Plastic Part Production |
|
|
Microbial Methods in Water Management |
|
|
Plastic Material Selection |
|
|
Plastic Part Failure Analysis |
|
|
Right-of-Way Acquisition Guidelines |
|
|
Rubber Materials Selection |
|
|
Safe Grounding Practices and Design for Outdoor AC Substations |
|
|
Silicone Elastomers Technology and Fabrication |
|
|
Six Sigma Green Belt for Services and Transactions - Summer |
|
|
Street Smarts for "Left-Brained" Professionals |
|
|
Sustainable Water-Centric Communities |
|
|
Water as the Stuff of Life and Business |
|
|
Watershed Planning - Putting the Pieces Together |
|
|
WiSE Breakfast Series - May 2 - Create the Work Environment that Fits Your Life |
| |
|
For more information, contact: |
|
|
Murali Vedula, mvedula@uwm.edu, 414-227-3121 Marcia Gabriel, gabrielm@uwm.edu, 414-227-3378
|